Square Feet:
Man-Hours:
Rosemary Grill
Our scope involved the build out of the restaurant space.
The utilities and power were brought to their appropriate locations; a final grade was achieved; interior slab was poured; conduit for low voltage was installed; interior walls were built along with ceiling and door installation; the restroom fixtures, flooring, and accessories were installed.